Enduser / Client:
Public Sector Local
Authority / Total Energy Solutions Provider
Technologies /
Services Provided:
IP54 variable speed
drives supplied, installed and commissioned to swimming pool
circulation pumps at a Northamptonshire leisure centre. Night
set-back operation incorporated into BMS control panel which in
turn was networked to client's remote monitoring system via GSM
modem.
Smart meter installed
on main incoming supply to verify energy savings achieved.
Delivery:
2009. |